{"id":69,"date":"2013-01-07T02:39:21","date_gmt":"2013-01-07T02:39:21","guid":{"rendered":"https:\/\/brianleefritz.com\/joomla\/2013\/01\/07\/michigan-comprehensive-trails-plan-call-to-action\/"},"modified":"2013-01-07T02:39:21","modified_gmt":"2013-01-07T02:39:21","slug":"michigan-comprehensive-trails-plan-call-to-action","status":"publish","type":"post","link":"https:\/\/brianleefritz.com\/joomla\/2013\/01\/07\/michigan-comprehensive-trails-plan-call-to-action\/","title":{"rendered":"Michigan Comprehensive Trails Plan &#8211; Call to Action!"},"content":{"rendered":"<p>The DNR has announced that a draft of the new Michigan Comprehensive Trails Plan is available online for public review and comment. Read the draft at: <a href=\"http:\/\/www.michigan.gov\/documents\/dnr\/draft_mi_trail_plan_12-2012_406477_7.pdf\" target=\"_blank\" rel=\"nofollow noopener\">http:\/\/www.michigan.gov\/documents\/dnr\/draft_mi_trail_plan_12-2012_406477_7.pdf<\/a> and submit comments using the survey at: <a href=\"http:\/\/www.surveymonkey.com\/s\/7YM69D2\" target=\"_blank\" rel=\"nofollow noopener\">http:\/\/www.surveymonkey.com\/s\/7YM69D2<\/a><\/p>\n<p>This plan is 140 pages in length, but the MTB trail-specific content begins at page 97 and ends at page 103. The bulk of the document reflects the needs of the ORV, Snowmobile, and Equestrian trail users.<\/p>\n<p><strong><span style=\"color: #008040; font-size: 150%; line-height: 116%;\">It would be great if each of our members clicked on this survey link<\/span><\/strong> and provided feedback to the Michigan Snowmobiles and Trails Advisory Council and DNR to let them know that we <strong>mountain bikers are out here in large numbers<\/strong>, that we <strong>spend money on travel and recreation<\/strong> in Michigan as well, and that we have more <strong>specific interests and needs<\/strong> than are described in this plan.<\/p>\n<p>Thanks!<\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The DNR has announced that a draft of the new Michigan Comprehensive Trails Plan is available online for public review and comment. Read the draft at: http:\/\/www.michigan.gov\/documents\/dnr\/draft_mi_trail_plan_12-2012_406477_7.pdf and submit comments using the survey at: http:\/\/www.surveymonkey.com\/s\/7YM69D2 This plan is 140 pages in length, but the MTB trail-specific content begins at page 97 and ends at page [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-69","post","type-post","status-publish","format-standard","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/posts\/69","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/comments?post=69"}],"version-history":[{"count":0,"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/posts\/69\/revisions"}],"wp:attachment":[{"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/media?parent=69"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/categories?post=69"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brianleefritz.com\/joomla\/wp-json\/wp\/v2\/tags?post=69"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}